Differences
This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
visan:example_counter_rate [2024/01/29 21:19] optrix |
visan:example_counter_rate [2024/01/29 21:39] (current) optrix |
||
---|---|---|---|
Line 26: | Line 26: | ||
* Right-click on the Time Difference node and choose ' | * Right-click on the Time Difference node and choose ' | ||
* Right-click in empty space, choose ' | * Right-click in empty space, choose ' | ||
+ | * Enter the name of the Event Source - in this case, 'Shift Schedule' | ||
* Drag the lower output from the Event Name node into the Pivot node. | * Drag the lower output from the Event Name node into the Pivot node. | ||
* Right-click the Pivot node, choose ' | * Right-click the Pivot node, choose ' | ||
Line 48: | Line 49: | ||
* Click on the ARDI Point and change the name to ' | * Click on the ARDI Point and change the name to ' | ||
- | {{pivot_mode_complete.png}} | + | {{counter_meters_complete.png}} |
+ | |||
+ | //NOTE: The above example is actually calculating **total meters travelled per day**, but the logic is identical.// | ||
===Analytic Complete=== | ===Analytic Complete=== | ||
- | And you're done - by pressing **Save and Visualise**, | + | And you're done - by pressing **Save and Visualise**, |
{{pivot_mode_display.png}} | {{pivot_mode_display.png}} | ||