Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
visan:example_counter_rate [2024/01/29 21:35]
optrix
visan:example_counter_rate [2024/01/29 21:39] (current)
optrix
Line 26: Line 26:
   * Right-click on the Time Difference node and choose 'Remove'   * Right-click on the Time Difference node and choose 'Remove'
   * Right-click in empty space, choose 'Add', 'ARDI' and 'Event Name'   * Right-click in empty space, choose 'Add', 'ARDI' and 'Event Name'
 +  * Enter the name of the Event Source - in this case, 'Shift Schedule'.
   * Drag the lower output from the Event Name node into the Pivot node.   * Drag the lower output from the Event Name node into the Pivot node.
   * Right-click the Pivot node, choose 'Title' and type 'Shift'   * Right-click the Pivot node, choose 'Title' and type 'Shift'
Line 54: Line 55:
 ===Analytic Complete=== ===Analytic Complete===
  
-And you're done - by pressing **Save and Visualise**, you'll have a simple analytic showing the number of times your machine changed state.+And you're done - by pressing **Save and Visualise**, you'll have a simple analytic showing the total amount of energy consumption for each shift and crew.
  
 {{pivot_mode_display.png}} {{pivot_mode_display.png}}